Vol 28 No 5 (2022)
Published: 2022-05-03
Articles
Balanced approach for tendering practice at the pre-contract stage: the UK practitioner’s perspective
Abstract 3291 | PDF Downloads 1216 | DOI https://doi.org/10.3846/jcem.2022.16580
Page 338–348
Cybersecurity assessment of BIM/CDE design environment using cyber assessment framework
Abstract 3414 | PDF Downloads 1642 | DOI https://doi.org/10.3846/jcem.2022.16682
Page 349–364
Causes and effects of poor communication in the construction industry in the MENA region
Abstract 7284 | PDF Downloads 3828 | DOI https://doi.org/10.3846/jcem.2022.16728
Page 365–376
An evidence-based risk decision support approach for metro tunnel construction
Abstract 2247 | PDF Downloads 658 | DOI https://doi.org/10.3846/jcem.2022.16807
Page 377–396
Study on seismic response of a new staggered story isolated structure considering SSI effect
Abstract 2128 | PDF Downloads 584 | DOI https://doi.org/10.3846/jcem.2022.16825
Page 397–407
Machine learning for text classification in building management systems
Abstract 2196 | PDF Downloads 1026 | DOI https://doi.org/10.3846/jcem.2022.16012
Page 408–421