Vol 28 No 4 (2022)
Published: 2022-03-08
Articles
Effective allocation of manpower in the production of precast concrete elements with the use of metaheuristics
Abstract 1355 | PDF Downloads 773 | DOI https://doi.org/10.3846/jcem.2022.16383
Page 247–260
Modeling of pavement roughness utilizing artificial neural network approach for Laos national road network
Abstract 1565 | PDF Downloads 877 | DOI https://doi.org/10.3846/jcem.2022.15851
Page 261–277
Automatic identification and quantification of safety risks embedded in design stage: a BIM-enhanced approach
Abstract 1609 | PDF Downloads 986 | DOI https://doi.org/10.3846/jcem.2022.16560
Page 278–291
Enhanced teacher-learning based algorithm in real size structural optimization
Abstract 1085 | PDF Downloads 535 | DOI https://doi.org/10.3846/jcem.2022.16387
Page 292–304
Understanding the changes in construction project managers’ competences through resume data mining
Abstract 1712 | PDF Downloads 1025 | DOI https://doi.org/10.3846/jcem.2022.16579
Page 305–319
Automatic safety evaluation and visualization of subway station excavation based on BIM-FEM/FDM integrated technology
Abstract 1306 | PDF Downloads 530 | DOI https://doi.org/10.3846/jcem.2022.16727
Page 320–336
Corrigenda
Corrigendum: Embedded remote group environment through modification in MACBETH - an application of contractor’s selection in construction
Abstract 862 | PDF Downloads 307 | DOI https://doi.org/10.3846/jcem.2022.16861
Page 337