Share:


Two-stage based dynamic earth-rock transportation assignment problem under fuzzy random environment to earth-rock dam construction

    Jiuping Xu Affiliation
    ; Cuiying Feng Affiliation

Abstract

This paper discusses a two-stage based dynamic transportation assignment problem (TS-based DTAP) under a fuzzy random environment in an earth-rock transportation system. This problem is a multi-objective dynamic programming optimization process for minimizing total operational cost, transportation duration and total waste. Triangular fuzzy random numbers are used for the uncertain parameters, and a hybrid crisp approach and an expected value operator are introduced to deal with these uncertainties. A dynamic programming based contraction particle swarm optimization is developed to solve the proposed expected value model for TS-based DTAP. Then, the earth-rock dam construction at Pubugou Hydropower project is used as a practical application to verify the proposed approach. Results and analysis are presented to highlight the performance of the proposed TS-based DTAP model and the optimization method, which proves to be effective and relatively efficient compared to the models under other environments and a standard PSO algorithm.

Keyword : dynamic transportation assignment problem, multi-objective optimization, fuzzy random environment, contraction particle swarm optimization

How to Cite
Xu, J., & Feng, C. (2015). Two-stage based dynamic earth-rock transportation assignment problem under fuzzy random environment to earth-rock dam construction. Journal of Civil Engineering and Management, 21(6), 775-797. https://doi.org/10.3846/13923730.2014.893909
Published in Issue
Jun 9, 2015
Abstract Views
634
PDF Downloads
333
Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.