Vol 28 No 5 (2022)
Published: 2022-05-03
Articles
Balanced approach for tendering practice at the pre-contract stage: the UK practitioner’s perspective
Abstract 2431 | PDF Downloads 1069 | DOI https://doi.org/10.3846/jcem.2022.16580
Page 338–348
Cybersecurity assessment of BIM/CDE design environment using cyber assessment framework
Abstract 2577 | PDF Downloads 1481 | DOI https://doi.org/10.3846/jcem.2022.16682
Page 349–364
Causes and effects of poor communication in the construction industry in the MENA region
Abstract 6084 | PDF Downloads 3470 | DOI https://doi.org/10.3846/jcem.2022.16728
Page 365–376
An evidence-based risk decision support approach for metro tunnel construction
Abstract 1499 | PDF Downloads 580 | DOI https://doi.org/10.3846/jcem.2022.16807
Page 377–396
Study on seismic response of a new staggered story isolated structure considering SSI effect
Abstract 1406 | PDF Downloads 534 | DOI https://doi.org/10.3846/jcem.2022.16825
Page 397–407
Machine learning for text classification in building management systems
Abstract 1449 | PDF Downloads 924 | DOI https://doi.org/10.3846/jcem.2022.16012
Page 408–421