Vol 26 No 5 (2020)
Published: 2020-05-07
Articles
A framework for evaluating an integrated BIM ROI based on preventing rework in the construction phase
Abstract 2446 | PDF Downloads 1417 | DOI https://doi.org/10.3846/jcem.2020.12185
Page 410-420
Understanding the structural behavior of historical buildings through its constructive phase evolution using H-BIM workflow
Abstract 1635 | PDF Downloads 866 | DOI https://doi.org/10.3846/jcem.2020.12612
Page 421-434
Evaluating the safety performance of China’s provincial construction industries from 2009 to 2017
Abstract 1282 | PDF Downloads 758 | DOI https://doi.org/10.3846/jcem.2020.12646
Page 435-446
Energy-saving building program evaluation with an integrated method under linguistic environment
Abstract 1204 | PDF Downloads 628 | DOI https://doi.org/10.3846/jcem.2020.12647
Page 447-458
An integrated scientometric and SNA approach to explore the classics in CEM research
Abstract 1371 | PDF Downloads 717 | DOI https://doi.org/10.3846/jcem.2020.12645
Page 459-474
Competitive advantages and barriers in international construction: an origin-host market approach
Abstract 1625 | PDF Downloads 1355 | DOI https://doi.org/10.3846/jcem.2020.12180
Page 475-489